Quick answer
When your biggest customer leaves, spend the first week on arithmetic, not reaction: redo the next 13 weeks without their revenue, find the lowest cash point, check the contract's notice terms, and rank bills by consequence. In weeks two to four, protect wages and essential suppliers, resize costs to the smaller business, and chase replacement work. Bridging finance helps only when the business works without that customer and simply needs time.
Key points
- Redo the cash forecast without the customer before you cut, borrow or hire.
- Read the contract — notice periods and termination terms decide how long you really have.
- Separate the timing gap (money still owed to you) from the permanent gap (revenue that's gone).
- Award wages rose 4.75% from 1 July 2026, so recheck labour costs against the smaller revenue base.
- A bridge suits a viable business adjusting; it won't rescue one that can't cover its costs.
The day the forecast stops being true
It might be a tender that went elsewhere at renewal, a new head of procurement trimming the supplier list, or a customer bringing the work in-house. Sometimes it’s a short email closing a relationship that ran for ten years. However it arrives, the business you ran last week now has a different shape.
Most businesses come through this. The ones that don’t tend to spend the first month reacting: cutting the wrong costs, borrowing the wrong amount, or waiting so long that options disappear. The plan below runs in dated blocks so each decision is made with the right numbers in front of you.
Days 1–3: how big is the hole, and when does it open?
Change nothing yet. First, split the loss into two parts.
The timing gap is money the customer still owes — issued invoices, work in progress, retentions. It should still arrive. List every item, confirm the balances with their accounts payable team, and get payment dates in writing. If anything suggests they’re in financial difficulty, read what to do when a customer goes into liquidation before you ship another order.
The permanent gap is revenue that won’t return. Pull the last 12 months: what did the customer bring in each month, and what did serving them cost in materials, labour, freight and commissions? The difference is the gross profit you lose every month from here.
Now redo the cash forecast for the next 13 weeks without that future revenue. business.gov.au’s cash flow guidance is built around this kind of statement. The lowest week on the new forecast is the number that sets your pace.
Can they actually walk away that fast? Check the contract
This is the question owners now ask most in the first few days, and it can buy real time.
Get the signed agreement out and look for three things:
- Notice period. Many supply and service contracts require 30, 60 or 90 days’ notice. Revenue during that period is still yours, and so is the time.
- Minimum volumes or committed orders. Purchase orders already accepted are usually still payable, even if future work stops.
- Termination clause. Is it “for convenience” (any reason) or only for breach? What must they pay on exit — stock made to their specification, mobilisation costs, early exit fees?
If the contract was a take-it-or-leave-it standard form and your business has fewer than 100 employees or turnover under $10 million, the unfair contract terms law may be relevant. Since 9 November 2023, the ACCC notes that proposing, using or relying on unfair terms in standard form small business contracts is banned, with penalties attached — and one-sided termination clauses are among the terms it has challenged. Whether a particular clause is unfair is a legal question, so get advice before you push it. Even a short extension of notice can move your low point weeks further out.
Days 4–7: what has to be protected first?
Write down every bill due in the next four weeks with its amount, date and consequence of lateness. Then sort them:
| Rank | What’s in it | What you do |
|---|---|---|
| Protect | Wages and super, ATO lodgements and payments, suppliers you can’t trade without | Pay on the date — fund it if you must |
| Negotiate | Suppliers you know well, the landlord, some tax timing | Ring before the due date with a specific plan |
| Pause | Discretionary spend, planned hires, non-urgent purchases | Hold until the forecast settles |
Super deserves its own line. Under Payday Super, which started on 1 July 2026, contributions are due at the employee’s fund within 7 business days of each payday. The old quarterly breathing room has gone. Our page on super guarantee timing sets out the dates.
Days 8–14: how do you shrink costs to fit the new revenue?
Work through costs from fastest-moving to slowest:
- Costs that followed the customer — materials, freight, subcontractors. They should fall on their own; check that they actually do.
- Discretionary overheads — software seats, marketing aimed at that customer, travel. Quick wins.
- Fixed overheads — premises, equipment finance, insurance. Slower to move, but ask whether you can sublet space, sell idle plant or restructure a lease.
- People — the hardest call. Look first at hours, moving staff onto new work, and natural attrition.
One date matters here. The Fair Work Commission lifted minimum and award wages by 4.75% from 1 July 2026, according to the Fair Work Ombudsman. If your budget still uses last financial year’s rates, your labour cost is understated just as revenue has fallen. Rerun it at current rates before deciding what the business can carry.
If roles do have to go, the Fair Work Ombudsman notes that most awards require final pay within 7 days after the last day of employment, including unused annual leave and any leave loading owed. Our guide to final pay when staff leave walks through the sums.
business.gov.au’s list of ways to improve cash flow — reviewing expenses, matching rosters to busy periods, selling assets you no longer use, talking to suppliers — doubles as a checklist for this fortnight.
Days 15–30: is bridging finance a bridge or a trap?
By this point you should know how deep the gap is, how long it lasts, and whether the resized business covers its costs at the new revenue level.
The third answer decides it:
- If the smaller business pays its way and the shortfall is about timing — invoices still to land, redundancy payouts, a few months to win replacement work — bridging finance can be exactly right. It lets you make measured decisions instead of fire-sale ones.
- If it can’t cover costs even after resizing, a loan only postpones the problem. Sit down with your accountant before taking on new debt.
Where a bridge makes sense, size it to the lowest point in the forecast plus a modest buffer; how much to borrow shows a simple method. If you’re ready to test the number, start a 60-second enquiry.
Unsecured and cash-flow options for trading businesses typically range from $20,000 to $500,000, sized on turnover and bank statements. Because a fall in turnover can shrink what’s available, enquiring early — before several months of lower deposits show on your statements — usually helps. Property-secured loans range from $20,000 to $5,000,000, with $20k to $250k possible same day and up to $5m possible within 24–48 hours; they give more room while revenue is in transition. A line of credit suits a gap whose size is still uncertain.
Who do you tell, and when?
- Staff — this week. Explain what’s happened and what you’re doing about it. Don’t promise what you can’t guarantee.
- Key suppliers — before your orders shrink. A brief call now protects the terms you’ll want later.
- Existing lenders — before the next report. Check covenants and reporting dates; a heads-up lands better than a surprise.
- Your accountant — in week one, not week four.
A worked example
Illustrative only. A commercial cleaning company loses a facilities contract worth 40% of revenue. The contract requires 60 days’ notice, which the owner confirms on day two, along with $210,000 still owed on 45-day terms. The 13-week forecast shows that once the notice period ends and the final invoices clear, the business is short by up to $160,000 in weeks 11–13, then steadies after cost changes.
Within a fortnight, the owner reruns labour costs at the July 2026 award rates, moves two supervisors onto smaller sites, hands back a leased van, and stops a software subscription tied to the lost client. With the resized business covering its costs, the owner arranges a property-secured loan to absorb the weeks 11–13 shortfall and the final pay for three staff who accept voluntary redundancy. By month five, a hospital and two schools have replaced about a third of the lost revenue.
How do you win replacement work without discounting?
The urge after a big loss is to buy volume with price. Resist it: thin-margin work fills the roster without fixing the cash. Instead:
- Call former customers and warm leads first — they already trust your work.
- Ask remaining customers what else they need, especially those using only part of what you offer.
- Price new work on its true cost to serve, including slow payment.
- Favour smaller, quicker-paying customers to rebuild resilience, even if each one is worth less.
How do you avoid this next time?
- Set a concentration ceiling — say, no customer above a quarter of revenue — and check it monthly.
- Negotiate notice periods and exit payments into larger contracts, so any loss comes with time.
- Keep a standby facility in place before you need it.
- Map your bills weekly. Our business bill calendar shows the next crunch while there’s still time to act.
Rebuild with time on your side
Losing a major customer hurts, but it isn’t the end of the story. If your numbers show a business that works at its new size and just needs a few months, tell us the size of the shortfall, the week it bites and the changes you’ve already made. Enquiring takes about 60 seconds and there’s no credit check when you first enquire. We won’t send your details to a pile of lenders; a real person reads your situation and calls you. Please be accurate on the form — including the recent drop in turnover and any notice period still running — so the option we put forward fits the business you’re rebuilding. To see your likely pathway first, try the urgency triage checker. If a repayment has already slipped, read about getting a business loan after a missed repayment.
Ready when you are
Check your options in about 60 seconds
A few quick questions. Asking won't touch your credit file, your details aren't sent to a pile of lenders, and a real person reads every enquiry.
Frequently asked questions
What should I do first after losing a major customer?
Redo your cash forecast without their future revenue and lock in payment dates for the invoices they still owe. Those two figures tell you how big the hole is and which week it bites.
Can a big customer end the contract without notice?
It depends on the contract. Check the notice period and termination clause first. If it's a standard form contract and your business has fewer than 100 employees or under $10 million in annual turnover, the unfair contract terms protections enforced by the ACCC may apply to one-sided termination terms. Get legal advice before relying on that.
Should I borrow to replace lost revenue?
Not to replace it permanently. Finance makes sense to cover the months it takes to resize costs and win new work — provided your forecast shows the business covers its costs at the lower revenue once those changes are made.
Will a lender still consider me after turnover has dropped?
Often, yes, but the drop matters. Unsecured funding is sized on recent turnover and bank statements, so a fall can reduce what's available — a reason to enquire early, before months of lower deposits show up. Property-secured finance leans more on the security and gives more room while revenue is in transition.
Should I cut staff straight away?
Not before the numbers are done and other costs reviewed. If roles do need to change, get advice on your obligations. Under most awards, final pay is due within 7 days after the last day of employment, so plan for it as a cash item.
How do I stop depending on one customer?
Set a ceiling on how much of your revenue or receivables any single customer can make up, and keep the pipeline full enough to stay under it. Diversifying takes time, so start while the large customer is still with you.